Approvals
As per the requirement of section 162 of the Electricity Act, 2003 , all new electrical installations are required to be approved by the Electrical inspector before energization under Regulations 43 of Central Electricity Authority (Measures Relating to Safety and Electric Supply) Regulations, 2010. Existing electrical installations are periodically inspected under Regulation 30.
CEIG Approvals
Liason with Chief Electrical inspector to Government(CEIG/CEA)
Preparation of Drawing and Specification Submission of Electrical Inspectorate Getting Drawing Approvals Arranging Inspection
Getting Safety Certificate.
TNEB Approvals
Liason with TANGEDCO /TNEB
Preparation of HT Application and Submission of EB Application for Load sanction and Online Uploading.
Arranging Site Inspection
Getting EMD Notice and Development Notice
Coordination with Meter Relay Testing Department (MRT)